WM. THOMAS ARNOLD, II CONSTRUCTION/PROJECT
MANAGER Address:
15457 N. 1815th Street,
Teutopolis, IL 62467-3352, (217) 690-1761 e-mail:
uofi78@hotmail.com SUMMARY OF
WORK EXPERIENCE:
Thirty-one years in the construction of
Buildings, Water and Wastewater Treatment Facilities, Bridges, Box Culverts,
Local Street Sections, Refinery and Petrochemical projects. Positions
held included: Superintendent (5 years), Lead Estimator (16 years), Chief
Estimator (6 years), Office Engineer, Scheduling (23 years), Cost Engineer
(28 years), Project Engineer, Project/Construction Manager (23 years), Vice
President (5 years), Member of Board of Directors (10 years) and finally
President (3 years) of Mautz & Oren, Inc. · Over 27 years experience in Waste and Water
Treatment Plants, Buildings and Highway Structures · 4 years of petrochemical project experience. · All projects completed on time and within budget. · Profit margins exceeded estimate by an average of
65% · All projects completed on schedule. EMPLOYMENT
HISTORY:
MAUTZ
& OREN, INC., Effingham,
IL
1983 to 2008 President of Mautz & Oren, Inc at
the time of its dissolution. Total responsibility for the management,
estimating, solicitation of subcontract and materials proposals, analysis of
proposals for inclusion in bid, purchasing, scheduling, contract execution
and negotiating of change orders and all other items associated with the
construction of Water and Wastewater Treatment, Buildings as well as Illinois
Department of Transportation projects. Strengths are in the civil
structural, mechanical and piping work on these projects and thorough
understanding of plans, specifications, problem solving and construction
methods/ techniques. My abilities to manage and estimate
projects are reflected by the success of these projects yielding an average
of 1.65 times the estimated profit margin during my tenure. We self
performed concrete (to include placement design), excavation (to included
design of safe excavations), piping (to included design utilized to order
piping materials), miscellaneous metal installation and process equipment installation.
Positions held: Superintendent, Project
Engineer, Estimator, Cost Engineer, Scheduler, Project Manager, Construction
Manager, Vice President and President. Other responsibilities included the
employment of management and field supervision, decisions on which projects
field personnel were assigned to also rested with me. Decisions and
recommendations, for what equipment was to be utilized on the projects as
well as recommending future equipment purchases and or replacement rested
with me. Worked closely with project engineering
firm(s) in reviewing project plans and specification and possible
discrepancies as they pertain to the contractibility of the project.
Prepared required submittals for review and approval by the engineering firm(s).
Worked closely with suppliers and subcontractors in their preparation of the
required submittals for the engineering firm(s) and the interpretation of the
plans and specifications as they pertained to the requisite submittals and
contract requirements. Prepared construction schedules and periodic
updates. During my employment I successfully
completed a 4 hour Construction Management seminary by the AGC in Open Shop
construction; Competent Person Training by the AGC and NUCA; Training in the
use of Primavera scheduling software; 60 hour Construction Project Management
Course by the AGC; 8 hour course in Management vs. Leadership, Stress
Management by the AGC. SAUDI
ARAMCO, Dhahran, Saudi
Arabia
1981 to 1983 Worked as a Cost Engineer with
assignments in both the procedures and the construction oversight
departments. Field assignment was as a cost engineer with a major
modification of a $360 million offshore oil production platform in the
Arabian Sea. During my employment, I completed a
40-hour course in Cost Planning & Evaluation System (COPES) by McDonald
Douglas Automation; 40-hour course in Management Control & Scheduling
System (MSCS) as well as numerous other computer training courses. MID-VALLEY,
INC., Houston,
TX
1978 to 1981 Worked in the corporate estimating
department, on refinery and steel mill estimates, and two separate Refinery
projects of Forty and Sixty Million Dollars. While on these projects, I
was the Chief Field Cost Engineer, Office Engineer and assisted the Project
and Scheduling Engineers in their duties and with the preparation of field
estimates and reports for management. Duties included monitoring ongoing
costs, calculating cost to complete, monitoring in-place quantities of work
complete and calculating percent complete. Reviewing daily time sheets
and material purchases with the project superintendents to facilitate proper
costing documents which were subsequently reviewed and analyzed in order to
prepare the information and reports that the Project Manager, Project
Superintendent and Project Engineer required. MILITARY: U.S. Army, 1971 to 1973, Security Clearance: Inactive Secret EDUCATION:
BS
– Civil Engineering, Construction Management, University of Illinois, Urbana,
IL AS
- Pre-Engineering, Lake Land College, Mattoon, IL Continuing
Education Listing Upon Request |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|